Critical Path Analysis in Practice
- Collected papers on project control
- Format
- Bog, paperback
- Engelsk
Normalpris
Medlemspris
- Du sparer kr. 30,00
- Fri fragt
-
Leveringstid: 9-13 hverdage (Sendes fra fjernlager) Forventet levering: 09-03-2026
- Kan pakkes ind og sendes som gave
Beskrivelse
Tavistock Press was established as a co-operative venture between the Tavistock Institute and Routledge & Kegan Paul (RKP) in the 1950s to produce a series of major contributions across the social sciences.
This volume is part of a 2001 reissue of a selection of those important works which have since gone out of print, or are difficult to locate. Published by Routledge, 112 volumes in total are being brought together under the name The International Behavioural and Social Sciences Library: Classics from the Tavistock Press.
Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.
Detaljer
- SprogEngelsk
- Sidetal166
- Udgivelsesdato07-05-2013
- ISBN139780415852975
- Forlag Routledge
- FormatPaperback
Størrelse og vægt
10 cm
Anmeldelser
Vær den første!
Findes i disse kategorier...
- Fagbøger
- Andre fagbøger
- Samfund og samfundsvidenskab
- Samfund og kultur: generelt
- Critical Path Analysis in Practice
- Fagbøger
- Andre fagbøger
- Samfund og samfundsvidenskab
- Sociologi og antropologi
- Critical Path Analysis in Practice
- Fagbøger
- Erhvervsliv, virksomheder og ledelse
- Ledelse og ledelsesteknikker
- Ledelse og beslutningstagning
- Critical Path Analysis in Practice